Pete Kondash leading the crew while working at St. Joseph’s Cathedral. If you need to find out why the light is not lit that is roughly 330 ft in the air, we can hoist you up there. Yes this setup of the 275 Ton Crane was put together to investigate why the recently renovated cross at the top of St. Joseph’s Cathedral light wasn’t lit. Pete and his team of Operating Engineers Ken Hretz, Mike Chapman, Wayne Fortin & Albert Muzzi working to set up the 275 Ton with 233′ of Main Boom and 121′ if inserts, assisted by the 33 ton crane. Great job everyone.